The requested change is investigated on how the product (the design) can be modified to solve the problem (conceptual approach). Options are noted and the chosen option is in detail described as the proposed modification.

The requested change is investigated on how the product (the design) can be modified to solve the problem (conceptual approach). Options are noted and the chosen option is in detail described as the proposed modification.
This process is a basic process and very...
Change management activities start when a...
The requested change is investigated on how the...
An impact analysis is performed to determine and...
An implementation plan is determined. In this...
The modification is executed: documents and...
The results are verified and are approved. The...
Increase the speed for implementation of changes...